Studii de caz


Studiu de caz M/V “GULIZAR ANA”
vezi atasament

After loading of 5th steel coils on 9th September at 20.55 hrs/lt vessel began to lean on starboard side till the vessel's accommodation has propped on main deck of floating crane "Dobrinesti 2"


© Autoritatea Navală Română 2012 - Toate drepturile rezervate. Utilizarea acestui site se face respectand Termenii si Conditiile