Case studiesM/V "GULIZAR ANA" After loading of 5th steel coils on 9th September at
20.55 hrs/lt vessel began to lean on starboard side till the
vessel's accommodation has propped on main deck of floating crane
"Dobrinesti 2" |
Case studiesM/V "GULIZAR ANA" After loading of 5th steel coils on 9th September at
20.55 hrs/lt vessel began to lean on starboard side till the
vessel's accommodation has propped on main deck of floating crane
"Dobrinesti 2" |